Corrugated Packaging

Corrugated Packaging: production orders and BOM, stock and warehouse, quality and reporting.

Challenges

  • Flute type and board composition are missing from the item card, so strength complaints never reach a root cause.
  • The cutting die belongs to the customer, yet its location is not tracked.
  • Converting between square metres and pieces is manual, so pricing stays inconsistent.
  • Trim waste and set-up waste are not measured, so small orders lose money.

Workflows

From board to box

  1. The corrugated board is defined by flute type and paper composition.
  2. The production order opens with box dimensions and print details.
  3. The cutting die is linked to the order and pulled from its storage location.

From waste to shipment

  1. Set-up waste and trim are recorded separately; the trim goes to recycling.
  2. Finished goods are stocked in both square metres and pieces.
  3. The delivery note is issued with pallet details at shipment.

Documents

  • Board specification card (flute type)
  • Cutting die record card
  • Production order (box size/print)
  • Delivery note (pallet)

Reports

  • Production by flute type
  • Die location and usage history
  • Set-up waste and trim rate
  • Profitability by order

Metrics

  • Cost per square metre
  • Set-up waste rate
  • Trim recovery rate
  • Margin by order

Compliance

  • Food-contact packaging regulations
  • Packaging waste declaration and recovery obligation
  • FSC/PEFC chain-of-custody certification (when requested)

Glossary

Flute type
The item card field that defines board strength
Cutting die
A tooling record owned by the customer whose location is tracked
Trim waste
A separate waste item routed to recycling
Square metre–piece
The dual-unit definition on the item card

FAQ

Can I keep the flute type on the item card?

Yes — flute type and paper composition are on record, and strength complaints are investigated with that data.

Can I track customer-owned cutting dies?

Yes — each die is recorded on its own card, showing shelf location and usage history.

Can I convert between square metres and pieces?

Yes — the dual-unit definition keeps both pricing and stock consistent.

Can I send the trim to recycling?

Yes — trim is a separate waste item and is booked as a recycling issue.

Can I see the profit on a small order?

Yes — set-up waste and die preparation are charged to the order, so the margin is realistic.

Sectors

Deevir
DEEVİR
Erp • Mrp • Crm • Saas • SMM • Cloud