Industrial Products

Industrial products: project manufacturing, MES, quality, export.

Challenges

  • In make-to-order work, drawing revisions are not tracked, so production runs on the wrong version.
  • Costs are not gathered per project, so nobody sees which job loses money.
  • Assembly and on-site commissioning stages are not tied to the work order.
  • Warranty start and scope are not on record, so service claims turn into arguments.

Workflows

From quote to project

  1. The quote is prepared from the customer specification and technical drawing.
  2. The approved quote becomes a project record and work orders.
  3. Drawing revisions are versioned and production starts on the current version.

From fabrication to commissioning

  1. Fabrication and assembly stages are tracked separately on the work order.
  2. On-site commissioning is closed with a signed record.
  3. The warranty period is recorded on the project and service claims link to the same record.

Documents

  • Technical specification and drawing
  • Project contract
  • Fabrication and assembly work order
  • Commissioning record

Reports

  • Cost and profitability by project
  • Revision history
  • Work-order progress status
  • Services under warranty

Metrics

  • Project profit margin
  • Schedule slippage days
  • Extra cost from revisions
  • In-warranty failure rate

Compliance

  • CE marking and machinery safety regulation
  • Welder certification and WPS/WPQR records
  • Occupational health and safety site records

Glossary

Make-to-order manufacturing
A one-off production job opened as a project
Drawing revision
A versioned document bound to production
Commissioning
The final project stage closed with a record
Warranty
A time-limited service assurance tied to the project

FAQ

Can I track drawing revisions?

Yes — every revision is versioned and the production order shows which version it is bound to.

Can I see profit per project?

Yes — material, labor and subcontractor costs gather on the project and are compared with revenue.

Can I track assembly stages?

Yes — fabrication and site assembly are marked as separate stages on the work order.

Can I record commissioning?

Yes — the site record is attached to the project and triggers the warranty start.

Can I make the warranty scope explicit?

Yes — the warranty period and scope live on the project and service claims link to the same record.