Aquaculture

Aquaculture: stock and warehouse, production and shipment, customer accounts and reporting.

Challenges

  • Stock and yield are not separated per pond or cage.
  • The feed conversion ratio is not calculated.
  • Water quality readings are not on record.
  • Mortality is not reflected in the biomass estimate.

Workflows

Pond and biomass

  1. The pond or cage is opened with fry count and date.
  2. Mortality and harvest are deducted from the biomass.
  3. Average weight is updated by sampling.

Feed and water quality

  1. Feed consumption is posted to the pond as a consumable.
  2. Temperature and oxygen readings are posted to the pond record.
  3. An out-of-threshold reading raises an alert.

Documents

  • Pond or cage record
  • Feed consumption slip
  • Water quality measurement record
  • Harvest slip

Reports

  • Biomass by pond
  • Feed conversion ratio
  • Water quality history
  • Mortality rate

Metrics

  • Feed conversion ratio
  • Mortality rate
  • Cost per kilogram
  • Average growth rate

Compliance

  • Aquaculture operating permit
  • Water quality monitoring obligation
  • Feed and medicine residue rules

Glossary

Pond or cage
Separately tracked production unit
Biomass
Stock derived from count and average weight
Feed conversion
Ratio of feed consumed to output produced
Water quality measurement
Measurement record tied to the production unit

Frequently Asked Questions

Can I separate stock per pond?

Yes — each pond or cage opens as a separate production unit with its own biomass tracking.

Can I compute the feed conversion ratio?

Yes — the feed posted to the pond is ratioed against growth to give the conversion.

Can I record water quality readings?

Yes — temperature and oxygen readings are posted to the pond record and an out-of-threshold value raises an alert.

Can mortality be reflected in the biomass?

Yes — mortality is deducted from the biomass and reported as a ratio.

Can I derive the cost per kilogram?

Yes — pond costs and harvest volume are held together, so the unit cost is computed.

Ready for Every Industry

Ready for Every Industry

Deevir in 197 countries

All countries

Czechia

Deevir price (from)
449 Kč / month
Tax (default)
Prices exclude 21% VAT.
E-invoicing regulation
E-invoicing is mandatory: e-invoicing.
Currency
Czech Koruna (CZK)
Date format
31. 12. 2026
Amount format
1 234 567,89 Kč
Time zone
Europe/Prague
Phone code
+420

What is the default DPH rate (country: Czechia)?

Deevir's default is 21%. Reduced rates and exemptions are set per product; confirm the exact rate with a local accountant.

Is e-invoicing mandatory (country: Czechia)?

E-invoicing is mandatory: e-invoicing. A live national network connection in Deevir is on the roadmap. This is a regulatory summary, not legal advice.

Czechia — ERP & Accounting Software

DEEVİR
Erp • Mrp • Crm • Saas • SMM • Cloud