Road, Infrastructure & Building Inspection

Road, infrastructure and building inspection: digital building file, field checklists, non-conformity tracking, concrete/sample records and regulation-based progress payments.

Challenges

  • Work is not tracked by chainage, so what was done where cannot be reported.
  • Item codes are not matched to unit prices, so progress bills are made by hand.
  • The cut-and-fill m³ balance is not kept, so haulage cost is uncontrolled.
  • Machine hours and fuel consumption are not linked to each other.

Workflows

From chainage to progress billing

  1. The job is defined by splitting it into chainage ranges.
  2. Every work item is entered with its item code and unit price.
  3. The progress bill is produced from the actual quantity.

Cut, fill and machinery

  1. Cut and fill m³ are recorded separately and the balance is reported.
  2. Machine hours and fuel consumption are posted to the job.
  3. Haul distance and tonnage feed into cost.

Documents

  • Chainage work record
  • Item code and unit price schedule
  • Progress billing document
  • Machine timesheet

Reports

  • Progress by chainage
  • Cut-and-fill balance
  • Machine hours and fuel
  • Cost by item code

Metrics

  • Daily output quantity
  • Cost per m³
  • Machine utilisation rate
  • Progress billing realisation percentage

Compliance

  • Public procurement regulations
  • Environmental impact assessment
  • Occupational health and safety records

Glossary

Item code
Work item code tied to a unit price
Chainage
Range that holds the location of the work
Cut-and-fill balance
Comparison of excavated and placed m³
Time Sheet
Record of machine or crew working hours

FAQ

Can I track work by chainage?

Yes — the job is split into chainage ranges and progress is reported on those ranges.

Can I generate progress bills by item code?

Yes — the item code is tied to a unit price and the actual quantity turns into a progress bill.

Can I balance cut and fill?

Yes — both are held as separate m³ and the difference is reported as haulage need.

Can I tie machine fuel consumption to the job?

Yes — timesheet hours and fuel consumption are posted to the same job record.

Can I update the unit price list?

Yes — the item schedule is updated per period and new progress bills use the current price.