Renovation

Renovation: projects and progress billing, stock and warehouse, customer accounts and e-Invoice.

Challenges

  • Quotes are not itemised, so work that surfaces later cannot be charged.
  • On-site measurement goes unrecorded, so material is over- or under-ordered.
  • Without a staged collection plan, cash runs tight mid-job.
  • Craftsman and subcontractor costs cannot be posted to a single job, so job profit is unknown.

Workflows

From measurement to quote

  1. On-site measurement and a work item list are produced.
  2. Every item enters the quote with quantity and unit price.
  3. The approved quote becomes a job.

Progress and collection

  1. Material, craftsman and subcontractor costs are posted to the job.
  2. If out-of-scope work appears it is submitted for approval as an extra item.
  3. Collection is taken according to the percentage of items completed.

Documents

  • On-site measurement form
  • Itemised quote
  • Extra work approval
  • Collection plan

Reports

  • Profitability by job
  • Out-of-scope work rate
  • Material consumption breakdown
  • Collection status

Metrics

  • Job profitability
  • Quotation conversion rate
  • Extra work rate
  • Average job duration

Compliance

  • Consumer contract rules
  • Waste management (spoil and rubble)
  • Occupational health and safety records

Glossary

Work item
Quote line holding quantity and unit price
Out-of-scope work
Extra quote item subject to approval
On-site measurement
Field record that feeds the quote
Staged collection
Collection plan tied to progress

FAQ

Can I break the quote into work items?

Yes — each item is entered with quantity and unit price, and the approved quote turns straight into a job.

Can I charge for work that surfaces later?

Yes — out-of-scope work goes for approval as an extra item and joins the job once approved.

Can I see profit per job?

Yes — material, craftsman and subcontractor costs are posted to the job, so profit comes out at job level.

Can I tie collection to progress?

Yes — a collection plan is built on the percentage of items completed.

Can I record on-site measurement?

Yes — the measurement form feeds the quote and the material order is calculated from it.

Sectors

Deevir
DEEVİR
Erp • Mrp • Crm • Saas • SMM • Cloud