Wind Power

Wind Power: production and BOM, stock and warehouse, shipment and reporting.

Challenges

  • Output and downtime are not kept per turbine, so a faulty turbine is spotted late.
  • The planned maintenance calendar is not assessed together with lost output.
  • Without a capacity factor, site performance cannot be benchmarked.
  • Spare-part stock is not tied to the turbine model, so the wrong part gets bought.

Workflows

Turbine and generation

  1. Each turbine is opened as an asset card with its model and rating.
  2. Periodic production and downtime are recorded per turbine.
  3. The capacity factor is computed against the installed capacity.

Maintenance and spare parts

  1. Planned maintenance is scheduled by turbine model.
  2. Spare-part stock is held bound to the model.
  3. A fault stoppage is recorded with a work order and linked to lost output.

Documents

  • Turbine asset card
  • Output and downtime record
  • Planned maintenance calendar
  • Fault work order

Reports

  • Output by turbine
  • Downtime analysis
  • Capacity factor
  • Spare-part consumption

Metrics

  • Capacity factor
  • Availability rate
  • Average downtime
  • Maintenance cost

Compliance

  • Energy regulator generation licence
  • Grid connection agreement
  • Environmental impact assessment

Glossary

Turbine
Asset card holding the model and rating
Capacity factor
Ratio of output to installed capacity
Downtime
Fault record linked to lost output
Planned maintenance
Work order scheduled by model

Frequently Asked Questions

Can I separate output by turbine?

Yes — each turbine is a separate asset card where output and downtime are posted.

Can I compute the capacity factor?

Yes — period output is ratioed against installed capacity and the factor is derived automatically.

Can I link downtime to lost output?

Yes — the fault work order holds the downtime and the lost output is reported.

Can I bind spare parts to the model?

Yes — the part's stock card matches the turbine model and a wrong part raises a warning.

Can I schedule planned maintenance?

Yes — the model's maintenance interval lands on the calendar and upcoming work appears on the list.

Ready for Every Industry

Ready for Every Industry

Deevir in 197 countries

All countries

Finland

Deevir price (from)
19 € / month
Tax (default)
Prices exclude 25.5% VAT.
E-invoicing regulation
E-invoicing is mandatory: Peppol BIS (2020).
Currency
Euro (EUR)
Date format
31.12.2026
Amount format
1 234 567,89 €
Time zone
Europe/Helsinki
Phone code
+358

What is the default ALV rate (country: Finland)?

Deevir's default is 25.5%. Reduced rates and exemptions are set per product; confirm the exact rate with a local accountant.

Is e-invoicing mandatory (country: Finland)?

E-invoicing is mandatory: Peppol BIS (2020). A live national network connection in Deevir is on the roadmap. This is a regulatory summary, not legal advice.

Finland — ERP & Accounting Software

DEEVİR
Erp • Mrp • Crm • Saas • SMM • Cloud