Building Materials

Building Materials: barcode sales and POS, stock and warehouse, customer accounts and e-Invoice.

Challenges

  • Goods sell by the tonne or cubic metre, yet stock is kept as plain quantities.
  • Freight cost never enters the sale, so profit looks higher than it is.
  • Site deliveries go to a different address and delivery tracking is disconnected.
  • Breakage and waste on cement and bricks are never recorded.

Workflows

From order to site delivery

  1. The contractor account and its price tier are set up.
  2. The order is entered in tonnes or cubic metres and the credit limit is checked.
  3. Delivery goes to the site address, with vehicle and freight added to the document.
  4. After delivery the invoice is issued and the receivable enters due-date tracking.

Waste and breakage

  1. Broken or spilled quantities are posted on a waste slip.
  2. The waste ratio is reported by product group.
  3. The cost impact becomes visible in the margin report.

Documents

  • Order form
  • Dispatch note (site)
  • Sales invoice
  • Waste slip

Reports

  • Profitability by customer
  • Cost including freight
  • Account ageing and exposure
  • Waste ratio

Metrics

  • Margin per tonne
  • Freight cost ratio
  • Average collection period
  • Waste ratio

Compliance

  • GİB e-Invoice / e-Waybill
  • Construction product conformity certificate
  • Road transport regulations
  • KVKK (Turkish data protection law)

Glossary

Tonne / cubic metre
Stock item with a unit of measure
Freight
Cost line on the document
Site delivery
Delivery address on the shipment
Breakage / waste
Shrinkage slip

FAQ

Can I add freight into the cost?

Yes — freight is a cost line on the document and the margin is computed including it.

Can I deliver to a site address?

Yes — the shipment document carries a delivery address separate from the billing address.

Can I sell by tonne or cubic metre?

Yes — the stock item carries a unit of measure and order and shipment stay in that unit.

Can I track partial shipments to a construction site?

Yes, order lines can be shipped piece by piece and the outstanding quantity stays visible.

Can I link the weighbridge reading to the delivery note?

Yes, the tonnage on the weighbridge ticket is carried over to the delivery note and deducted from stock.

Sectors

Deevir
DEEVİR
Erp • Mrp • Crm • Saas • SMM • Cloud