Panels & Transformers

Panels & Transformers: production orders and BOM, stock and warehouse, quality and reporting.

Challenges

  • Every switchboard is project-specific, so the bill of materials is rewritten from scratch each time.
  • Single-line diagram revisions are not tracked, so production follows an outdated design.
  • On-site commissioning is missing from the work order, so project closure is seen too late.
  • Switchgear has long lead times, yet it is not planned at the moment the order is taken.

Workflows

From project to bill of materials

  1. The project and its single-line diagram are recorded and given a revision number.
  2. A project-specific bill of materials (panel BOM) is created.
  3. A purchase requisition is raised for long-lead switchgear.

From assembly to commissioning

  1. Panel assembly and wiring operations are tracked on the work order.
  2. Factory test results and nameplate data are recorded.
  3. Once on-site commissioning is complete, the project closes and the progress invoice is issued.

Documents

  • Single-line diagram and revision log
  • Project-specific bill of materials (panel BOM)
  • Factory test and nameplate report
  • Commissioning report

Reports

  • Cost and profit by project
  • Long-lead material waiting report
  • Revision change log
  • Commissioning completion status

Metrics

  • Project delivery time
  • Material procurement delay
  • Profit margin by project
  • Test retry rate

Compliance

  • IEC 61439 compliance for panel type and routine tests
  • CE marking and the electrical installations regulation
  • Occupational health and safety — authorisation for electrical work

Glossary

Single-line diagram
Revision-controlled technical document linked to the project
Panel BOM
Bill of materials created specifically for the project
Commissioning
The on-site work-order stage that closes the project
Switchgear
Stock item with a long procurement lead time

Frequently Asked Questions

Can I create a bill of materials specific to each project?

Yes — a separate bill of materials is opened per project and can be copied from a similar one to save time.

Can I track diagram revisions?

Yes — the revision number belongs to the project, and each work order shows which revision it was opened with.

Can I order long-lead materials early?

Yes — lead time is defined on the item card, and a purchase requisition is triggered the moment the order is taken.

Can I track the commissioning stage?

Yes — on-site commissioning is a separate stage on the work order, and the project closes once it is done.

Can I see project profitability?

Yes — material, labour and field costs accumulate on the project code and are compared against progress billing.

Ready for Every Industry

Ready for Every Industry

Deevir in 197 countries

All countries

Hungary

Deevir price (from)
6990 Ft / month
Tax (default)
Prices exclude 27% VAT.
E-invoicing regulation
E-invoicing is mandatory: e-invoicing (2018+).
Currency
Hungarian Forint (HUF)
Date format
2026. 12. 31.
Amount format
1 234 568 Ft
Time zone
Europe/Budapest
Phone code
+36

What is the default ÁFA rate (country: Hungary)?

Deevir's default is 27%. Reduced rates and exemptions are set per product; confirm the exact rate with a local accountant.

Is e-invoicing mandatory (country: Hungary)?