Facade Systems

Facade Systems: projects and progress billing, stock and warehouse, customer accounts and e-Invoice.

Challenges

  • Facade m² does not match the panel and glass order, so waste is high.
  • Scaffold rental time is not posted to the job, so the cost of delay stays invisible.
  • The assembly crew's floor-by-floor progress is not tracked.
  • Glass and profile batch numbers are not kept, so a warranty claim cannot be evidenced.

Workflows

From survey to order

  1. The facade is split into floors and grid lines and measured in m².
  2. Panel, glass and profile requirements are computed from the survey.
  3. The order goes to the supplier with a batch number.

Scaffolding and assembly

  1. Scaffold erection date and rental period are posted to the job.
  2. Assembly progress is posted as a percentage per floor.
  3. A completed facade is closed with handover minutes.

Documents

  • Facade survey sheet
  • Panel and glass order
  • Scaffold rental record
  • Assembly handover minutes

Reports

  • Assembly progress by floor
  • Material waste rate
  • Scaffold cost
  • Traceability by batch

Metrics

  • Cost per m²
  • Waste ratio
  • Daily assembly m²
  • On-time delivery rate

Compliance

  • Construction product conformity certificate
  • Fire and facade regulation
  • Work-at-height safety

Glossary

Grid line
Measurement unit that divides the facade
Batch number
Traceability code for glass and profile
Scaffold rental
Time-based expense posted to the job
Facade m²
The measure that order and cost rest on

FAQ

Can I derive the order from the facade survey?

Yes — m² measured per floor and grid line produces panel, glass and profile requirements directly.

Can I measure the waste rate?

Yes — ordered and installed quantities are compared and the waste is reported.

Can I post scaffold cost to the job?

Yes — the rental period is tied to the job and the cost of delay shows in the report.

Can I track assembly progress per floor?

Yes — each floor holds its own percentage and daily assembly m² is computed.

Can I retain the glass batch number?

Yes — the batch number stays in the stock and assembly records and serves as evidence in a warranty claim.