Furniture

Furniture: make-to-order production, project, assembly/delivery.

Challenges

  • Every fabric and colour option of the same model is opened as a separate item, so the stock list bloats.
  • No panel cutting plan is produced, so the waste rate is unknown and never enters the cost.
  • Edge banding, screws and slides are missing from the bill of materials, so stock counts never reconcile.
  • On installed deliveries, freight and assembly labour never reach the order's profit figure.

Workflows

From order to cutting plan

  1. The order is taken with model, fabric, colour and size variant.
  2. Panel, edge banding and hardware requirements are derived from the bill of materials.
  3. The panel cutting plan is generated; used area and waste are recorded separately.

From production to installed delivery

  1. Cutting, edge banding, drilling and assembly operations are tracked on the work order.
  2. Finished goods are stocked; the delivery vehicle and installation crew are scheduled.
  3. The installation handover record is signed and the invoice is issued.

Documents

  • Variant item card (fabric/colour/size)
  • Panel cutting plan printout
  • Production order and routing
  • Installation handover record

Reports

  • Panel waste and utilisation efficiency
  • Sales breakdown by variant
  • Actual cost by order
  • Installation and freight expense breakdown

Metrics

  • Panel utilisation efficiency
  • Order lead time
  • Stock turnover per variant
  • Post-installation rework rate

Compliance

  • Formaldehyde emission class declaration for wood products
  • Flammability and upholstery fabric standards
  • Product safety and assembly instruction obligation

Glossary

Variant
The option structure that keeps colour, fabric and size on a single item card
Cutting plan
The layout output that determines panel usage and waste
Edge banding
An auxiliary material defined in the bill of materials by running metres
Installed delivery
The work order stage covering shipment and installation

FAQ

Can I gather fabric and colour options under one item?

Yes — with the variant structure the model stays a single card while fabric, colour and size are defined as options.

Can I measure panel waste?

Yes — used area and waste from the cutting plan are recorded separately and efficiency is reported.

Do consumables such as screws, slides and edge banding come off stock?

Yes — they are defined in the bill of materials by metres and pieces and are deducted automatically when the production order closes.

Can I charge installation and freight cost to the order?

Yes — installation and freight expenses are added to the order cost and appear in the profit report.

Can I see which model earns the most?

Yes — the variant-level sales and actual-cost report shows profitability broken down by model.

Sectors

Deevir
DEEVİR
Erp • Mrp • Crm • Saas • SMM • Cloud