Greenhouse

Greenhouse: stock and warehouse, production and shipment, customer accounts and reporting.

Challenges

  • Yield per greenhouse bay is not measured.
  • Heating and irrigation costs cannot be allocated to the crop.
  • The weekly harvest rhythm does not reconcile with stock.
  • The post-spraying harvest waiting period is not tracked.

Workflows

Greenhouse bay and production

  1. The bay is opened with its area, crop and planting date.
  2. Climate and irrigation records are attached to the bay.
  3. The weekly harvest is entered on the bay and yield per bay is derived.

Inputs and harvest waiting period

  1. Heating, fertiliser and spray costs are allocated to the bay.
  2. The post-spraying waiting period runs as a counter.
  3. Attempting a harvest before the period ends raises a warning.

Documents

  • Greenhouse bay record
  • Climate and irrigation record
  • Spraying record
  • Weekly harvest slip

Reports

  • Yield per bay
  • Heating and irrigation cost
  • Spraying and waiting period
  • Weekly harvest listing

Metrics

  • Yield per square metre
  • Heating cost share
  • Weekly harvest consistency
  • Waste ratio

Compliance

  • Plant protection product record
  • Pre-harvest interval rule
  • Good agricultural practices

Glossary

Greenhouse bay
Production unit holding an area and a crop
Pre-harvest interval
Counter-based restriction after spraying
Weekly harvest
Recurring periodic stock entry
Climate record
Measurement record tied to a production unit

FAQ

Can I measure yield per greenhouse bay?

Yes — the harvest is entered on the bay and divided by its area to give yield per square metre.

Can I allocate heating cost to the crop?

Yes — heating and irrigation costs are allocated to the bay and flow into the crop cost.

Can I link the weekly harvest to stock?

Yes — each harvest creates a periodic stock entry and the quantity is posted to the bay.

Can I track the waiting period after spraying?

Yes — the waiting period runs as a counter and a harvest attempted before it ends raises a warning.

Can I see the waste rate?

Yes — the gap between harvest and saleable quantity is reported as waste.

Sectors

Deevir
DEEVİR
Erp • Mrp • Crm • Saas • SMM • Cloud