Shipbuilding & Yachts

Shipbuilding & Yachts: production orders and BOM, stock and warehouse, quality and reporting.

Challenges

  • Projects run long, so cost only becomes visible when the job ends and interim margin stays unknown.
  • Progress is not measured by block and section, so progress billing turns into an argument.
  • Classification-society survey records stay in paper files and have to be hunted for at audit time.
  • Subcontract and outsourced work hits the project cost late, so budget variances are noticed too late.

Workflows

From project to block fabrication

  1. The project is opened with a block and section breakdown.
  2. A bill of materials and a routing are defined for each block.
  3. Plate cutting, welding and assembly operations are tracked on the work order.

From survey to progress billing

  1. Classification-society inspection and test results are added to the project file.
  2. The percentage of completion is updated block by block.
  3. The progress billing is prepared from that progress and invoiced.

Documents

  • Project and block breakdown list
  • Welding procedure specification and welder certificates
  • Class survey and test reports
  • Progress billing file

Reports

  • Progress and cost by block
  • Budget versus actual variance
  • Subcontract and outsourcing cost breakdown
  • Progress billing collection status

Metrics

  • Project percentage of completion
  • Budget variance rate
  • Weld rejection rate (NDT)
  • Progress billing collection period

Compliance

  • Classification society rules and survey approvals
  • Welder certification and WPS/NDT records
  • Maritime occupational safety and shipyard environmental permits

Glossary

Block
A sub-work item and cost centre under the project
Survey
A quality inspection record linked to the project
Progress billing
An invoice document based on progress
NDT
The weld quality-control step and its result

FAQ

Can I see interim cost before the project ends?

Yes. Material, labour and subcontract costs accumulate in real time on the project and block code.

Can I measure progress block by block?

Yes. Each block is a separate work item, and its percentage of completion feeds the progress billing calculation.

Can I link survey records to the project?

Yes. Inspection and test reports are held in the project document archive.

Can I see subcontractor cost on time?

Yes. Outsourced work orders and subcontractor progress billings hit the project cost immediately.

Can I catch budget variances early?

Yes. The budget-versus-actual comparison is reported at block level.