Solar Installation

Solar Installation: appointments and service tracking, customers and CRM, e-Invoice and reporting.

Challenges

  • Survey and design files are scattered across email, so quote revisions get mixed up.
  • Panel and inverter serial numbers go unrecorded, so warranty claims cannot be filed.
  • Installation stages are not tracked, so nobody knows which site is at which step.
  • Progress billing and the collection plan do not follow the contract, so cash flow cannot be forecast.

Workflows

From survey to contract

  1. The site survey is recorded with roof or land dimensions and consumption data.
  2. The design output produces the bill of materials and the quote.
  3. The approved quote is tied to the contract and the collection plan.

From installation to commissioning

  1. Panels and inverters ship to site with their serial numbers and leave stock.
  2. Installation stages — structure, panels, cabling — are checked off on the work order.
  3. Once commissioning and application paperwork are complete, the progress invoice is issued.

Documents

  • Survey and design report
  • Bill of materials (panel/inverter serial numbers)
  • Installation work order
  • Commissioning and application paperwork

Reports

  • Project progress by site
  • Progress billing and collection status
  • Material tracking by serial number
  • Quote-to-contract conversion

Metrics

  • Survey-to-contract conversion rate
  • Project completion time
  • Progress-billing collection delay
  • Installed capacity per site (kWp)

Compliance

  • Grid connection agreement and application paperwork (unlicensed generation)
  • Electrical installation conformity and acceptance procedures
  • Occupational health and safety records (working at height)

Glossary

Solar power plant (PV site)
A solar plant site tracked as a project
Progress billing
Invoice and collection plan tied to a stage
Commissioning
The final installation stage closed with paperwork
Serial-number tracking
The stock record linking panels and inverters to a site

FAQ

Can I track panel serial numbers?

Yes — panels and inverters ship with serial numbers and the destination site is on record.

Can I track installation stages?

Yes — each site is checked off stage by stage on the work order and progress shows in the report.

Can I tie progress billing to the contract?

Yes — the collection plan is tied to stages; a completed stage produces the progress invoice.

Can I keep quote revisions?

Yes — each revision is versioned on the same opportunity record and the approved one becomes the contract.

Can I manage several sites at once?

Yes — each site opens as its own project; crew, materials and progress billing attach to that site.