Steel Structures

Steel Structures: production orders and BOM, stock and warehouse, quality and reporting.

Challenges

  • Mark numbers do not match the shop drawings, so the wrong pieces get assembled on site.
  • The welding procedure specification (WPS) and welder certificates are not linked to the work order.
  • Cost per tonne is never calculated, so the quote and the actual drift apart.
  • Site erection progress is not tied to progress billing.

Workflows

From drawing to fabrication

  1. The shop drawing is converted into a piece list with mark numbers.
  2. Cutting, drilling and welding operations are defined on the work order.
  3. The welding procedure and a certified welder are attached to the work order.

From erection to progress billing

  1. Marks shipped to site are tracked with delivery notes.
  2. Erection progress is recorded in tonnes.
  3. Completed tonnage triggers the progress invoice.

Documents

  • Piece list and shop drawing
  • Welding procedure specification (WPS) record
  • Fabrication work order
  • Erection progress billing form

Reports

  • Fabrication status by mark
  • Cost and margin per tonne
  • Welder certificate validity
  • Site erection progress

Metrics

  • Cost per tonne
  • On-time erection rate
  • Weld rework rate
  • Progress payment collection time

Compliance

  • EN 1090 structural steel conformity certificate
  • Welder qualification and WPS/WPQR records
  • Occupational health and safety records for work at height

Glossary

Mark number
A unique tracking code linking each piece to its drawing
WPS
The welding procedure record attached to the work order
Tonnage
The unit of measure used for costing and progress billing
Progress billing
An interim invoice tied to erection progress

FAQ

Can I track pieces by mark number?

Yes — every mark is linked to its drawing, and fabrication, shipping and erection status are visible per mark.

Can I attach the welding procedure to the work order?

Yes — the WPS and a certified welder are added to the work order, and an expiring welder certificate raises an alert.

Can I get cost per tonne?

Yes — material, labour and welding consumables are divided by tonnage to report unit cost.

Can I tie erection progress to progress billing?

Yes — the tonnage erected on site triggers the progress invoice.

Can I compare the quote with the actual?

Yes — project cost is reported side by side with the quoted line items.