Wood Products

Wood Products: production orders and BOM, stock and warehouse, quality and reporting.

Challenges

  • Log-to-lumber yield is never measured, so the true cost stays unknown.
  • Kiln batches are not recorded, so moisture-driven losses only surface later.
  • Stock is kept sometimes in m3, sometimes in m2, sometimes in pieces, so counting and selling units clash.
  • By-products such as sawdust and short lengths never enter stock, so revenue leaks away.

Workflows

From log to lumber

  1. The log batch enters stock with its volume in m3 and its origin details.
  2. After sawing, the resulting lumber dimensions and by-products are recorded.
  3. Yield is calculated per batch and allocated to cost.

From kiln drying to dispatch

  1. A kiln batch is opened; the charged quantity and the target moisture content are recorded.
  2. At unloading, the moisture reading and the loss are posted and the batch is closed.
  3. Goods are taken into stock by length and grade, then shipped with a delivery note.

Documents

  • Log receipt and origin certificate
  • Sawing yield slip
  • Kiln batch card
  • Grade and length breakdown

Reports

  • Yield rate by batch
  • Kiln drying loss report
  • Stock list with unit-of-measure conversion
  • By-product revenue (sawdust, short lengths)

Metrics

  • Log yield
  • Kiln drying loss rate
  • Grade distribution
  • Production cost per m3

Compliance

  • Forest-product origin and transport permit
  • Heat treatment (ISPM 15) stamp — export packaging
  • Dust and fire safety occupational health records

Glossary

Yield
A per-batch calculation giving the share of finished goods obtained from the input m3
Kiln batch
A production order that tracks one kiln load in a single record
Moisture content
The quality measurement field on the batch card
By-product
A secondary item that comes out of production and is taken into stock

FAQ

Can I see log yield by batch?

Yes — the input m3 is compared with the finished goods and by-products, and the yield is reported on the batch card.

Can I track kiln drying losses?

Yes — the kiln batch records charged and discharged quantities plus moisture readings, and the loss is calculated automatically.

Can I use m3, m2 and piece units together?

Yes — a conversion factor is defined on the item card, so counting and selling can use different units.

Can I turn sawdust and short lengths into revenue?

Yes — they are taken into stock as by-products and invoiced as a separate sales line.

Can I price by grade?

Yes — grade is a field on the item card and price lists are defined per grade.