Aluminum & Joinery

Aluminum & Joinery: production orders and BOM, stock and warehouse, quality and reporting.

Challenges

  • Room measurements live in Excel, so the cutting list and actual production never match.
  • Without profile length optimisation, offcut waste comes out high.
  • Glass and hardware are not tied to the bill of materials, so orders arrive incomplete.
  • The installation stage is not part of the work order, so delivery dates slip.

Workflows

From measurement to cutting list

  1. The room schedule is recorded with dimensions and type (window/door).
  2. The cutting list is generated with profile length optimisation.
  3. Glass and hardware are pulled from the bill of materials into the order.

From production to installation

  1. Cutting, corner cleaning and assembly operations are tracked on the work order.
  2. Site installation is planned as a separate stage and ticked off on completion.
  3. The job closes with a handover record and the progress invoice is issued.

Documents

  • Room measurement schedule
  • Cutting list (length optimisation)
  • Glass and hardware bill of materials
  • Installation handover record

Reports

  • Profile offcut rate
  • Cost by opening
  • Installation progress status
  • Order shortage item report

Metrics

  • Profile utilisation efficiency
  • Cost per opening
  • Installation completion time
  • Shortage item rate

Compliance

  • CE marking and declaration of performance for construction products
  • Thermal insulation and energy performance regulations
  • Occupational health and safety records for work at height

Glossary

Room schedule
A measurement breakdown by room and opening
Length optimisation
The profile cutting plan that reduces waste
Hardware bill of materials
The bill of materials holding items such as hinges and locks
Installation stage
The work order step that closes the site job

FAQ

Can I generate a cutting list from the measurements?

Yes — once the opening dimensions are entered, a length-optimised cutting list is produced automatically.

Can I reduce profile waste?

Yes — length optimisation builds the plan that yields the most pieces per bar, and waste is reported.

Can glass and hardware be added to the order automatically?

Yes — the bill of materials is defined, so choosing the type pulls in the matching glass and hardware items.

Can I see installation progress?

Yes — site installation is a separate stage on the work order and completed openings are ticked off.

Can I work out cost per opening?

Yes — profile, glass, hardware and labour are accumulated at opening level.

Sectors

Deevir
DEEVİR
Erp • Mrp • Crm • Saas • SMM • Cloud