Electronics Manufacturing

Electronics Manufacturing: production orders and BOM, stock and warehouse, quality and reporting.

Challenges

  • Component lead times keep shifting, so the production plan stalls on sudden shortages.
  • SMT placement consumption and feeder scrap go unmeasured, so the real cost looks lower than it is.
  • AOI and functional test results are never recorded, so the root cause of defects stays hidden.
  • Board revisions are not tracked separately, so nobody knows which BOM went into a board in the field.

Workflows

From BOM to placement

  1. A revision-controlled bill of materials and approved component alternates are defined.
  2. Material requirements planning raises purchase orders for the missing components.
  3. SMT placement and soldering operations are tracked on the work order.

From test to shipment

  1. AOI and functional test results are recorded board by board.
  2. Boards needing repair drop into a separate work order with a coded defect reason.
  3. Boards that pass are received into stock with a serial number and shipped.

Documents

  • Revision-controlled bill of materials (BOM)
  • Approved component alternates list
  • AOI and functional test record
  • Serial-numbered delivery note

Reports

  • Component shortage and waiting report
  • Placement scrap and feeder loss
  • Test defect code distribution
  • Actual cost per board

Metrics

  • First pass yield
  • Rework rate
  • Component supply delay
  • Production cost per board

Compliance

  • RoHS and REACH substance restrictions
  • IPC-A-610 solder quality acceptance criteria
  • ESD (electrostatic discharge) protection procedure

Glossary

BOM revision
Version-numbered record of the bill of materials
Alternate component
Approved substitute item held on the bill of materials
AOI
Quality-control step and the record of its result
Rework
A second work order opened for repair

FAQ

Can I see component shortages in advance?

Yes — material requirements planning factors in lead times and lists the gaps early.

Can I define alternate components?

Yes — approved substitutes are defined on the bill of materials, and the one actually used is recorded in production.

Can I keep test results per board?

Yes — test results and defect codes are stored against the serial number.

Can I see the cost of rework?

Yes — repair is a separate work order, and its labour and material flow into the board cost.

Can I find the revision of a board in the field?

Yes — the serial number is linked to the BOM revision used in production.

Sectors

Deevir
DEEVİR
Erp • Mrp • Crm • Saas • SMM • Cloud