Pasta & Semolina

Pasta & Semolina: production orders and BOM, stock and warehouse, quality and reporting.

Challenges

  • Semolina and flour intake is not tracked by lot, so nobody can tell which raw batch a finished pack came from.
  • Production orders are not opened per line, so the output of lines running at the same time blurs into one total.
  • Drying cycle time is never recorded, so line capacity and the reason for delays cannot be measured.
  • The 500 g, 5 kg and case variants sit on one stock card, so order fulfilment keeps going wrong.

Workflows

From semolina to production order

  1. Incoming semolina, flour and pulses are accepted with a lot number and a quality control form is filled in.
  2. A line-specific production order is opened from the bill of materials and the raw lot is reserved to it.
  3. Dough mixing and shaping steps are posted on the order; consumed quantities come off stock.

From drying to dispatch

  1. The drying cycle is logged on the order with start and end times, and the cycle time is measured.
  2. Finished goods enter stock by pack-size variant, with lot number and best-before date.
  3. Orders are picked and a delivery note is issued; the lot code carries onto the note line.

Documents

  • Incoming material quality control form
  • Line-based production order
  • Lot and best-before date label
  • Delivery note

Reports

  • Line-based output and downtime report
  • Lot traceability: from raw material to dispatch
  • Waste and rejected finished goods breakdown
  • Stock and sales by pack-size variant

Metrics

  • Hourly output per line (tonnes/hour)
  • Average drying cycle time
  • Semolina-to-product conversion efficiency
  • Waste rate per lot

Compliance

  • Turkish Food Codex communiqué on pasta and wheat products
  • ISO 22000 – HACCP food safety management
  • Turkish Revenue Administration e-document regime (e-invoice, e-waybill)

Glossary

Semolina
The main raw material line in the bill of materials
Line
The work centre the production order is assigned to
Cycle time
The gap between the start and end of a production order step
Best-before date
The expiry date carried on the lot record

FAQ

Can I find out which flour lot a finished product came from?

Yes — the raw lot is bound to the production order, so you can trace back from the finished lot on a single screen.

Can I follow each line separately?

Yes — every production order is opened on one line, and output, downtime and consumption are reported per line.

Can I measure drying time?

Yes — the start and end times of the drying step are posted on the order, and average cycle time comes out by line.

Can I hold pack sizes as separate stock?

Yes — 500 g, 5 kg and case are each a product variant, and the bill of materials also draws the packaging from stock.

Can I see lots whose best-before date is approaching?

Yes — the date on the lot record turns into an alert in the stock report, and dispatch suggests a first-in first-out order.

Sectors

Deevir
DEEVİR
Erp • Mrp • Crm • Saas • SMM • Cloud