Prefabricated Buildings
Prefabricated Buildings: projects and progress billing, stock and warehouse, customer accounts and e-Invoice.
Challenges
- Factory production and site assembly look like one job, so the source of delay cannot be found.
- Without a per-module bill of materials, orders come out short.
- Freight cost is booked to overhead instead of the product price.
- The assembly crew's time on site is not measured.
Workflows
From order to production
- The module order is taken with dimensions, type and quantity.
- Material requirements are derived from the module recipe.
- Once factory production is complete the module is taken into stock.
Freight and assembly
- Shipment is planned by vehicle, distance and module count.
- Freight cost is posted to the order.
- Site assembly is recorded with crew and duration, then handover minutes are produced.
Documents
- Module order
- Production recipe
- Dispatch note
- Assembly handover minutes
Reports
- Order production status
- Module cost breakdown
- Freight cost
- Assembly duration analysis
Metrics
- Module unit cost
- Production cycle time
- On-time delivery rate
- Assembly man-hours
Compliance
- Construction product conformity certificate
- CE marking
- Occupational health and safety records
Glossary
- Module
- Production item tied to a recipe
- Factory production
- In-house production stage that is taken into stock
- Site assembly
- Post-shipment service work order
- Dispatch note
- Outbound document for the module leaving to site
FAQ
Can I separate factory and site work?
Yes — factory production is a stock movement and site assembly is tracked as a separate work order.
Can I define a module recipe?
Yes — each module type has a bill of materials and order requirements come from it.
Can I load freight onto the order?
Yes — shipment cost is posted directly to the related order.
Can I measure assembly duration?
Yes — the assembly crew and time on site are recorded on the work order.
Can I produce handover minutes?
Yes — once assembly is complete the minutes are created linked to the order record.