Solar Power Plant

Solar Power Plant: production and BOM, stock and warehouse, shipment and reporting.

Challenges

  • Installed capacity (kWp) and actual output (kWh) are not reported together.
  • Panel and inverter stock is not reserved per project, so the site ends up short.
  • Maintenance and cleaning cycles are not linked to output decline.
  • Reconciling energy sold to the grid with the invoice is done by hand.

Workflows

From project to commissioning

  1. The plant project is opened with its installed capacity (kWp).
  2. Panels, inverters and mounting structures are reserved to the project.
  3. The commissioning test and acceptance record are produced.

Generation and maintenance

  1. Periodic output (kWh) is posted to the plant record.
  2. Maintenance and panel cleaning are planned as work orders.
  3. Energy sold to the grid is reconciled with the invoice.

Documents

  • Plant project card
  • Material reservation
  • Commissioning acceptance record
  • Maintenance work order

Reports

  • kWp versus kWh comparison
  • Output by plant
  • Maintenance history
  • Energy sales reconciliation

Metrics

  • Specific yield (kWh/kWp)
  • Availability rate
  • Maintenance cost
  • Payback period

Compliance

  • Energy regulator licence or unlicensed-generation notification
  • Grid connection agreement
  • Renewable support scheme registration and reporting

Glossary

kWp
Installed capacity held on the plant card
kWh
Record of actual output for the period
Inverter
Stock item reserved to the project
Commissioning
Project step closed by an acceptance record

FAQ

Can I compare installed capacity with output?

Yes — kWp sits on the plant card and kWh in the period record, so specific yield is derived automatically.

Can I reserve materials to a project?

Yes — panels and inverters are reserved to the project record and a warning appears if stock is short.

Can I relate maintenance to output decline?

Yes — the maintenance work order and the period output are reported on the same plant record.

Can I reconcile energy sales?

Yes — the kWh fed to the grid is compared with the invoice amount.

Can I track several plants separately?

Yes — each plant is a separate project card and a comparative report is available.