HVAC Systems

HVAC Systems: production orders and BOM, stock and warehouse, quality and reporting.

Challenges

  • Capacity (kW) is worked out by hand in the quote, so the wrong unit gets recommended.
  • Serial numbers and F-gas records run separately, which makes the legal declaration painful.
  • Installation and commissioning are not tied to a work order, so the warranty start is unclear.
  • Scheduled maintenance contracts are never linked to the equipment register.

Workflows

From capacity to production

  1. The required capacity (kW) is calculated from the room data and a model is selected.
  2. A production order is opened with the chosen model and configuration.
  3. The unit is received into stock with its serial number and refrigerant charge.

From installation to maintenance

  1. Installation and commissioning are completed under a work order and the warranty starts.
  2. The equipment record is linked to the customer and the site.
  3. The maintenance contract is added to the equipment record and generates reminders.

Documents

  • Capacity calculation sheet (kW)
  • Production order and serial number record
  • Commissioning report
  • Scheduled maintenance contract

Reports

  • Equipment register and location listing
  • F-gas charge and declaration report
  • Maintenance contract renewal calendar
  • In-warranty failure rate

Metrics

  • Cost per unit
  • Commissioning lead time
  • Maintenance contract renewal rate
  • In-warranty failure rate

Compliance

  • CE marking and ecodesign / energy label
  • F-gas (fluorinated greenhouse gas) recording and reporting obligation
  • Vocational competence certificate for installation staff

Glossary

Capacity (kW)
The technical field that drives the quote and the model choice
Equipment register
An asset record tracked by serial number
F-gas record
The statutory declaration field that holds the charge amount
Maintenance contract
A recurring service agreement linked to the equipment record

FAQ

Can I run the capacity calculation from the quote?

Yes — the required kW is calculated from the room data and a suitable model is proposed.

Can I keep the F-gas records?

Yes — the charge amount is written to the equipment record and the declaration report is generated from it.

Can I tie commissioning to the warranty?

Yes — once the report is signed, the warranty period starts on the equipment record.

Can I attach the maintenance contract to the unit?

Yes — the contract is added to the equipment record and raises a reminder when service is due.

Can I see where each unit is installed?

Yes — the record is associated with the customer and the installation site.

Sectors

Deevir
DEEVİR
Erp • Mrp • Crm • Saas • SMM • Cloud