Carpentry & Joinery

Carpentry & Joinery: projects and progress billing, stock and warehouse, customer accounts and e-Invoice.

Challenges

  • Customer dimensions stay on paper, so cutting errors surface only after production.
  • Without panel nesting optimisation, waste is high.
  • The assembly appointment and the production finish date do not line up.
  • Hardware stock (hinges, rails, handles) is not tracked separately, so assembly stalls half-done.

Workflows

From measurement to cutting

  1. Customer dimensions are recorded per location.
  2. The cutting list is derived from the panel layout and waste is calculated.
  3. Cutting and edge banding are opened as work orders.

Hardware and assembly

  1. Hardware requirements are reserved against the work order.
  2. The assembly appointment is set against the production finish date.
  3. After assembly, handover minutes and a warranty record are produced.

Documents

  • Measurement sheet
  • Cutting list
  • Hardware reservation
  • Assembly handover minutes

Reports

  • Panel waste rate
  • Work order status
  • Hardware stock status
  • Assembly calendar

Metrics

  • Waste ratio
  • Order cycle time
  • On-time assembly rate
  • Material cost per job

Compliance

  • Product warranty obligation
  • Timber material conformity certificate
  • Occupational health and safety records

Glossary

Location
Location unit the measurement was taken in
Cutting list
List of parts yielded by the panel
Edge banding
Production step within the work order
Hardware reservation
Stock allocation bound to the work order

FAQ

Can I enter dimensions into the system?

Yes — dimensions are recorded per location and the cutting list is produced straight from them.

Can I reduce panel waste?

Yes — the cutting list is derived from the panel layout and the waste rate is reported.

Can I prevent hardware shortages?

Yes — hardware is reserved against the work order and the order warns if stock is short.

Can I tie the assembly appointment to production?

Yes — the appointment is set for a date after production finishes.

Can I keep a warranty record?

Yes — along with the handover minutes, the warranty start is posted to the customer record.

Sectors

Deevir
DEEVİR
Erp • Mrp • Crm • Saas • SMM • Cloud