Machinery Manufacturing

Machinery Manufacturing: production orders and BOM, stock and warehouse, quality and reporting.

Challenges

  • There is no link between the machine serial number and the spare parts sold, so service ships the wrong part.
  • The assembly bill of materials is not versioned, so nobody knows which part fits an older machine.
  • Without a commissioning report, the warranty start date is always disputed.
  • Service history is not kept against the machine, so recurring faults go unnoticed.

Workflows

From order to serial number

  1. The order configuration determines the assembly bill of materials.
  2. A production order is opened and the finished machine receives its own serial number.
  3. A spare parts list tied to that serial number is generated.

From commissioning to service

  1. The on-site commissioning report is signed and the warranty starts.
  2. Service requests are linked to the machine serial number.
  3. Recurring faults and the parts used are listed in the machine history.

Documents

  • Assembly bill of materials (versioned)
  • Production order and serial number record
  • Commissioning report
  • Spare parts list

Reports

  • Service history by serial number
  • In-warranty failure rate
  • Spare parts demand frequency
  • Cost by project

Metrics

  • Cost per machine
  • In-warranty failure rate
  • Service response time
  • Spare parts margin

Compliance

  • CE marking and the machinery safety directive
  • Keeping a technical file and a user manual on hand
  • ISO 9001 quality management records

Glossary

Serial number
The unique code that ties a machine to its service and parts
Assembly bill of materials
A recipe that is versioned and bound to the serial number
Commissioning
The documented milestone that starts the warranty
Spare parts list
Sales items attached to the serial number

FAQ

Can I link spare parts to a specific machine?

Yes — the bill of materials tied to the serial number shows exactly which part fits.

Can I keep the recipes of older machines?

Yes — the bill of materials is versioned and every serial number carries the version it was built with.

Can I pin down when the warranty starts?

Yes — the commissioning report starts the warranty period and stays on record.

Can I see the service history?

Yes — every service request is linked to the serial number and recurring faults are reported.

Can I work out the cost of each machine?

Yes — material, assembly labour and testing costs all accumulate on the production order.

Sectors

Deevir
DEEVİR
Erp • Mrp • Crm • Saas • SMM • Cloud