Printing & Publishing

Printing & publishing: job-specific production, project, consumables.

Challenges

  • Print run, paper weight and size combinations are calculated by hand in every quote.
  • Plate cost is not charged to the job, so margins evaporate on short runs.
  • Print set-up waste and paper waste rates are not measured.
  • Finishing steps such as cutting and binding are not tied to the work order, so deadlines slip.

Workflows

From quote to work order

  1. The quote is calculated by entering print run, paper weight and size.
  2. The approved quote becomes a work order and the plate cost is charged to the job.
  3. Paper requirement, including the waste allowance, is reserved from stock.

From printing to finishing

  1. Print set-up waste and production waste are recorded separately.
  2. Finishing steps such as cutting, binding and lamination are tracked as stages on the same work order.
  3. When the job closes, the invoice is issued and job-level profit is reported.

Documents

  • Print quote (run/weight/size)
  • Work order
  • Plate and cylinder record
  • Delivery note

Reports

  • Cost and profitability by job
  • Paper waste rate
  • Finishing stage status
  • Press utilization report

Metrics

  • Cost per thousand impressions
  • Paper waste rate
  • On-time delivery rate
  • Press utilization rate

Compliance

  • Banderole and publishing regulation (for printed publications)
  • Packaging-waste and paper recovery declaration
  • GİB e-Invoice and e-Archive

Glossary

Print run
The print quantity on the work order
Plate / form
A make-ready item charged as cost to the job
Grammage and size
Technical fields on the paper item card
Finishing
A work-order stage such as cutting or binding

FAQ

Can I calculate the quote from run size and grammage?

Yes — once run size, paper weight and format are entered, cost and price come out automatically.

Can I charge plate cost to the job?

Yes — plate and make-ready costs are added as lines on the work order, so margins on short runs are accurate.

Can I measure paper waste?

Yes — set-up and production waste are recorded separately and the rate is reported.

Can I track finishing steps?

Yes — cutting and binding are marked as stages on the same work order, so slippage shows early.

Can I see press utilization?

Yes — open work orders are listed on the press calendar and free capacity is visible.

Sectors

Deevir
DEEVİR
Erp • Mrp • Crm • Saas • SMM • Cloud