Textile & Apparel

Textile & apparel: size/color matrix, CMT costing, PLM/tech-pack, subcontracting, export.

Challenges

  • Different dye lots of the same colour get mixed, so shade differences show up in the order.
  • Yarn is bought by the kilo but fabric is sold by the metre, so stock never reconciles between the two units.
  • Roll numbers go unrecorded, so people search the warehouse to find how many metres are left on which roll.
  • Greige fabric sent to the subcontractor does not match what comes back, so the waste calculation turns into an argument.

Workflows

From yarn to greige fabric

  1. Yarn purchases enter stock by the kilo with a lot number.
  2. A weaving or knitting production order is opened; the yarn consumption in the bill of materials is deducted from stock.
  3. The greige fabric produced is recorded with its roll number, metres and weight.

From dye lot to dispatch

  1. A dyeing and finishing lot is opened; each roll is linked to the lot it was dyed in.
  2. At lot exit a colour quality check is made; approved rolls are booked into finished goods stock.
  3. The order is filled from a single lot; the delivery note is issued with roll and metre detail.

Documents

  • Weaving/knitting production order
  • Dyeing and finishing lot slip
  • Roll label and lot card
  • Subcontract work order and waste report

Reports

  • Production and waste report by dye lot
  • Stock and remaining metres list by roll
  • Metre–kilo dual unit stock reconciliation
  • Quantity sent and returned by subcontract workshop

Metrics

  • First-time approval rate of dye lots
  • Metres obtained per kilogram
  • Production waste rate
  • Turnaround time from subcontractors

Compliance

  • Turkish Revenue Administration e-Document scheme (e-invoice/e-delivery note)
  • OEKO-TEX Standard 100 product safety
  • Textile labelling and fibre composition regulations

Glossary

Roll (piece)
A stock unit tracked by lot number
Dye lot
A production order tracked as a colour lot
Metre–kilo
A dual unit stock item
Subcontracting
A subcontract work order issued to an external workshop

FAQ

Can I keep different lots of the same colour apart?

Yes — each dye lot is tracked as a separate lot, the order is filled from one lot only, and shade differences are prevented.

Can I track fabric in both metres and kilos?

Yes — the stock item carries dual units: receipts are posted in kilos, sales in metres, and the two units convert to each other.

Can I hold stock by roll number?

Yes — every roll is recorded with its own lot number, and the metres left on it plus its shelf location are visible instantly.

Can I track the fabric sent to subcontractors?

Yes — the subcontract work order compares quantity sent with quantity returned; the gap is reported as waste and posted to the workshop's account.

Can yarn consumption be deducted from the bill of materials?

Yes — the bill of materials defines yarn consumption per metre, and when the production order closes the usage is deducted from stock automatically.

Sectors

Deevir
DEEVİR
Erp • Mrp • Crm • Saas • SMM • Cloud