Machining & CNC

Machining & CNC: production orders and BOM, stock and warehouse, quality and reporting.

Challenges

  • Machine cycle time is never measured, so cost per part is unknown.
  • Cutting-tool life and cost are not charged to the job.
  • Tolerance measurements are not recorded against the part, so a rejected batch cannot be investigated.
  • First article approval is undocumented, so surprises show up in series production.

Workflows

From first article to series

  1. The work order is opened with the drawing and tolerance values.
  2. The first article is produced and submitted for approval with an inspection report.
  3. After approval, series production starts on the same work order.

From machine to cost

  1. Machine cycle time and tool usage are posted to the work order.
  2. Measurement results are logged on the part record and out-of-tolerance pieces are set aside.
  3. Cost per part is calculated from time, tooling and material.

Documents

  • Drawing and tolerance sheet
  • First article inspection report
  • CNC work order
  • Inspection and quality control report

Reports

  • Machine utilisation and time variance
  • Tool life and tooling cost
  • Out-of-tolerance part rate
  • Unit cost by part

Metrics

  • Machining time per part
  • Tooling cost ratio
  • First-pass yield
  • Machine utilisation rate

Compliance

  • ISO 9001 quality management records
  • IATF 16949 and PPAP file for automotive supply
  • Hazardous waste disposal declaration for cutting oil and emulsion

Glossary

First article approval
The sample quality record that unlocks series production
Tool life
A cutting-tool cost item tracked by a usage counter
Tolerance
The technical field compared against in the inspection report
Machine time
The operation time measured at the work centre

FAQ

Can I calculate cost per part?

Yes — machine time, tool usage and material are accumulated on the work order and divided by the piece count.

Can I track tool life?

Yes — each cutting tool is tracked by a usage counter and raises an alert when its life is spent.

Can I store measurement results?

Yes — an inspection report with tolerance comparison is attached to the part record.

Can I make first article approval mandatory?

Yes — the series production step stays locked until the sample is approved.

Can I see machine utilisation?

Yes — open work orders appear on the machine calendar and free capacity is visible.