Iron, Steel & Metalworks (Mfg/Trade)

Iron, Steel & Metalworks (Mfg/Trade): production orders and BOM, stock and warehouse, quality and reporting.

Challenges

  • The heat (cast) number is not linked to stock, so the mill certificate is typed out by hand for each customer.
  • Energy and electrode costs are not allocated to the product, so the cost per tonne comes out understated.
  • The composition of scrap input is not recorded, so analysis deviations are discovered too late.
  • Stock is sometimes kept in tonnes and sometimes in pieces, so counting and selling units clash.

Workflows

From scrap to heat

  1. Scrap and alloy inputs are booked into stock with a weighbridge ticket.
  2. A heat number is opened; melting and casting operations are tracked.
  3. The spectral analysis result is written onto the heat record.

From rolling mill exit to shipment

  1. Rolled product is stocked with length, section and tonnage details.
  2. A mill certificate is generated per heat.
  3. Shipment is made with a weighbridge ticket and a delivery note.

Documents

  • Scrap and alloy weighbridge ticket
  • Heat (cast) record and analysis report
  • Mill certificate
  • Weighbridge ticket and delivery note

Reports

  • Analysis and deviation report by heat
  • Energy and consumable cost per tonne
  • Yield and loss rate
  • Tonne-to-piece stock reconciliation

Metrics

  • Production cost per tonne
  • Heat yield
  • Energy consumption (kWh/tonne)
  • Analysis deviation rate

Compliance

  • EN 10204 material inspection certificates
  • Industrial emission and stack gas monitoring obligation
  • Hazardous waste (slag, dust) disposal declaration

Glossary

Heat (cast) number
The production batch and traceability key
Mill certificate
A document output generated from the batch record
Yield
The share of finished output obtained from input tonnage
Weighbridge ticket
A stock movement based on the weighing record

FAQ

Can I generate the mill certificate from the system?

Yes — the analysis results on the heat record feed the certificate output directly.

Can I allocate energy cost to the cost per tonne?

Yes — energy and consumable costs are allocated to the production order and enter the cost per tonne.

Can I track the scrap composition?

Yes — input batches are linked to the heat, so analysis deviations can be examined by input.

Can I use tonnes and pieces together?

Yes — a conversion factor is defined on the item card, so counting and selling can use different units.

Can I match shipments to the weighbridge record?

Yes — the weighbridge ticket is linked to the stock movement and the delivery note follows the weighing.

Sectors

Deevir
DEEVİR
Erp • Mrp • Crm • Saas • SMM • Cloud