Printing & Publishing
Printing & publishing: job-specific production, project, consumables.
Challenges
- Print run, paper weight and size combinations are calculated by hand in every quote.
- Plate cost is not charged to the job, so margins evaporate on short runs.
- Print set-up waste and paper waste rates are not measured.
- Finishing steps such as cutting and binding are not tied to the work order, so deadlines slip.
Workflows
From quote to work order
- The quote is calculated by entering print run, paper weight and size.
- The approved quote becomes a work order and the plate cost is charged to the job.
- Paper requirement, including the waste allowance, is reserved from stock.
From printing to finishing
- Print set-up waste and production waste are recorded separately.
- Finishing steps such as cutting, binding and lamination are tracked as stages on the same work order.
- When the job closes, the invoice is issued and job-level profit is reported.
Documents
- Print quote (run/weight/size)
- Work order
- Plate and cylinder record
- Delivery note
Reports
- Cost and profitability by job
- Paper waste rate
- Finishing stage status
- Press utilization report
Metrics
- Cost per thousand impressions
- Paper waste rate
- On-time delivery rate
- Press utilization rate
Compliance
- Banderole and publishing regulation (for printed publications)
- Packaging-waste and paper recovery declaration
- GİB e-Invoice and e-Archive
Glossary
- Print run
- The print quantity on the work order
- Plate / form
- A make-ready item charged as cost to the job
- Grammage and size
- Technical fields on the paper item card
- Finishing
- A work-order stage such as cutting or binding
FAQ
Can I calculate the quote from run size and grammage?
Yes — once run size, paper weight and format are entered, cost and price come out automatically.
Can I charge plate cost to the job?
Yes — plate and make-ready costs are added as lines on the work order, so margins on short runs are accurate.
Can I measure paper waste?
Yes — set-up and production waste are recorded separately and the rate is reported.
Can I track finishing steps?
Yes — cutting and binding are marked as stages on the same work order, so slippage shows early.
Can I see press utilization?
Yes — open work orders are listed on the press calendar and free capacity is visible.