Prefabricated Buildings

Prefabricated Buildings: projects and progress billing, stock and warehouse, customer accounts and e-Invoice.

Challenges

  • Factory production and site assembly look like one job, so the source of delay cannot be found.
  • Without a per-module bill of materials, orders come out short.
  • Freight cost is booked to overhead instead of the product price.
  • The assembly crew's time on site is not measured.

Workflows

From order to production

  1. The module order is taken with dimensions, type and quantity.
  2. Material requirements are derived from the module recipe.
  3. Once factory production is complete the module is taken into stock.

Freight and assembly

  1. Shipment is planned by vehicle, distance and module count.
  2. Freight cost is posted to the order.
  3. Site assembly is recorded with crew and duration, then handover minutes are produced.

Documents

  • Module order
  • Production recipe
  • Dispatch note
  • Assembly handover minutes

Reports

  • Order production status
  • Module cost breakdown
  • Freight cost
  • Assembly duration analysis

Metrics

  • Module unit cost
  • Production cycle time
  • On-time delivery rate
  • Assembly man-hours

Compliance

  • Construction product conformity certificate
  • CE marking
  • Occupational health and safety records

Glossary

Module
Production item tied to a recipe
Factory production
In-house production stage that is taken into stock
Site assembly
Post-shipment service work order
Dispatch note
Outbound document for the module leaving to site

FAQ

Can I separate factory and site work?

Yes — factory production is a stock movement and site assembly is tracked as a separate work order.

Can I define a module recipe?

Yes — each module type has a bill of materials and order requirements come from it.

Can I load freight onto the order?

Yes — shipment cost is posted directly to the related order.

Can I measure assembly duration?

Yes — the assembly crew and time on site are recorded on the work order.

Can I produce handover minutes?

Yes — once assembly is complete the minutes are created linked to the order record.