Fasteners

Fasteners: production orders and BOM, stock and warehouse, quality and reporting.

Challenges

  • Goods are produced by weight but sold by piece, so stock and prices need constant correction.
  • When plating goes to a subcontractor the WIP stock disappears and return losses cannot be measured.
  • Without batch traceability, customer complaints cannot be traced back to their source.
  • Box, carton and pallet packaging variants are opened as separate items, so the item list bloats.

Workflows

From wire to forging

  1. Wire and bar raw material enters stock with a batch number.
  2. Cold forging and thread rolling operations are tracked on the work order.
  3. Output quantity is recorded in both kilograms and pieces.

From plating to packed shipment

  1. The semi-finished part is sent to plating on a subcontract work order.
  2. Returned quantity, loss and coating thickness measurement are posted.
  3. Goods are packed by packaging unit and leave with a delivery note.

Documents

  • Raw material batch record
  • Production order (forging/threading)
  • Subcontract plating work order
  • Packaging and delivery note

Reports

  • Kilogram-to-piece conversion reconciliation
  • Subcontract plating loss report
  • Batch traceability breakdown
  • Sales by packaging unit

Metrics

  • Cost per kilogram
  • Subcontract turnaround time
  • Loss rate
  • Order fulfilment rate

Compliance

  • DIN/ISO fastener dimension and property classes
  • EN 10204 inspection document and salt spray test records
  • Hazardous waste and discharge permit for plating baths

Glossary

Kilogram-to-piece conversion
The unit conversion factor on the item card
Subcontracted plating
An external work order that keeps WIP stock visible
Batch (lot)
A batch-numbered stock movement kept for traceability
Packaging variant
The box/carton/pallet option of the same item

FAQ

Can I produce by weight and sell by piece?

Yes — the conversion factor is defined on the item card, and stock and invoicing use the same calculation.

Can I track material at the plating subcontractor?

Yes — the quantity sent on a subcontract order stays visible in WIP stock; returns and losses are posted.

In a complaint, can I find which batch it came from?

Yes — the batch chain is traced from raw material through to shipment.

Can I gather packaging options under one item?

Yes — box, carton and pallet are defined as packaging variants and stock is managed from a single card.

Can I record the coating thickness?

Yes — the quality measurement taken on subcontract return is written to the batch record.

Sectors

Deevir
DEEVİR
Erp • Mrp • Crm • Saas • SMM • Cloud