Manufacturing & Factory

Manufacturing & factory: MRP/BOM, MES/shop-floor, quality, costing, maintenance, master data.

Challenges

  • The bill of materials lives in Excel, so cost never updates when raw-material prices change.
  • Work-center capacity is invisible, so delivery dates are promised on guesswork.
  • Work-in-progress stock is not tracked, so nobody knows what sits in intermediate inventory.
  • Planned and actual production costs are never compared.

Workflows

From order to production order

  1. The customer order is linked to the bill of materials and the material requirement is derived.
  2. A purchase request is opened for the missing raw material.
  3. The production order is opened with work center and operation routing.

From production to cost

  1. Operation start and finish are recorded at the work center.
  2. Consumed raw materials and semi-finished goods post to the production order.
  3. Actual cost is compared with the plan and the variance is reported.

Documents

  • Bill of materials (BOM)
  • Production order
  • Material requirement report
  • Delivery note

Reports

  • Planned vs. actual cost variance
  • Work-center load and efficiency
  • WIP and intermediate stock status
  • Due-date adherence report

Metrics

  • Unit production cost
  • Work-center efficiency
  • On-time delivery rate
  • Scrap rate

Compliance

  • CE marking and declaration of conformity
  • ISO 9001 quality management records
  • GİB e-Invoice and e-Waybill

Glossary

Bill of materials (BOM)
The raw-material and semi-finished recipe of a finished good
Operation routing
Production steps that pass through work centers
Work center
A production resource with defined capacity and cost
Semi-finished goods
An item stocked as intermediate production output

Frequently Asked Questions

Can I compute cost from the bill of materials?

Yes — as raw-material prices change, finished-goods cost and margin update automatically.

Can I see work-center capacity?

Yes — open production orders show on the work-center calendar, and the load backs up your delivery promise.

Can I keep semi-finished goods in stock?

Yes — intermediate output is received into stock on its own item card and consumed by the next order.

Can I compare plan against actual?

Yes — consumption and times on the production order are reported against the plan.

Can I measure scrap separately?

Yes — scrap posts to the production order as its own line and shows separately in the rate report.

Ready for Every Industry

Ready for Every Industry

Deevir in 197 countries

All countries

Singapore

Tax (default)
Prices exclude 9% VAT.
E-invoicing regulation
E-invoicing is mandatory: InvoiceNow (2026/2031).
Currency
Singapore Dollar (SGD)
Date format
31/12/2026
Amount format
$1,234,567.89
Time zone
Asia/Singapore
Phone code
+65

What is the default GST rate (country: Singapore)?

Deevir's default is 9%. Reduced rates and exemptions are set per product; confirm the exact rate with a local accountant.

Is e-invoicing mandatory (country: Singapore)?

E-invoicing is mandatory: InvoiceNow (2026/2031). A live national network connection in Deevir is on the roadmap. This is a regulatory summary, not legal advice.

Singapore — ERP & Accounting Software

DEEVİR
Erp • Mrp • Crm • Saas • SMM • Cloud